Skip to product information
1 of 9

PetLoc8

Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (4-Mo Subscription Included)

Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (4-Mo Subscription Included)

Regular price $82.42 USD
Regular price $82.42 USD Sale price
Shipping calculated at checkout.

About This

  • Enjoy peace of mind knowing your device comes with 4 months of subscription included. After four months, you can continue using the device with the flexible and transparent tariff plan you choose (check the product gallery to see the tariff plans).
  • NEVER LOSE YOUR CAT – Works Anywhere With 4G Sim - Real-time GPS tracking shows your cat’s exact location anytime, anywhere. iOS & Android app.
  • ULTRA-SMALL & LIGHTWEIGHT – The smallest waterproof tracker for cats, designed to be collar-compatible and comfortable for daily wear.
  • SMART ALERTS & GEO-FENCE – Get instant notifications if your cat leaves a safe zone.
  • LONG-LIFE RECHARGEABLE BATTERY – Up to 14 days on a single charge for worry-free protection.

Overview

  • Brand : PETLOC8
  • Special Feature : Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
  • Connectivity Technology : 4G LTE CAT 1, Bluetooth, Wi-Fi
  • Included Components : Collar Mount, User Manual, GPS tracker, Charging Cable
  • Item Weight : 1.06 Ounces
View full details